2017 REAAA Roadshow
- Resilience in Transportation Systems - “Designed in and Sometimes Bolted On” by Herby Lissade, CALTRANS
- The Alternate Route—Keeping the South Island Connected by Richard Topham, NCTIR
- The Economic Impacts of Connectivity by Anthony Byett, ECPC Ltd & Adolf Stroombergen, Infrometrics Consulting Ltd
- Investigations after the disaster - informing decision makers by Paul Burton, Geotechnics
- Planning & engineering for (all sorts of) disaster by David Willmott, Centre for Urban and Transport Studies
- Lessons to be learned from 15-year-old second-coat seals & reseals by Laurence Harrow, Opus International Consultants Ltd
- Resilience assessment of state highways in New Zealand by Presenters: Doug Mason & P Brabhaharan, Opus International Consultants
- Towards resilient transport networks through connected decision-making by Dr Vivienne Ivory & Dr Maggie Trotter, Opus International Consultants (Wellington seminar only)
- Local Topic Auckland - Kirkbride Interchange by Iwan Sudarno, Beca Ltd & Hunter White, Fletcher Construction
- Local Topic Rotorua - Two new tools for RCA’s Asset Managers, Thanks REG by Mike Tapper, Beca Ltd Simon Fendall, NZTA
- Local Topic Wellington - An overview of quarry and tsunami response planning, for road operations by Richard Mowll, Wellington Lifelines Group
- Local Topic Christchurch - Kaiapoi East – The long road to rebuilding by Jeanette Ward, Abley Consultants
- Local Topic Dunedin - SH1 Dunedin One-Way Separated Cycleways – If a separated cycleway is the answer, what was the question? by Andrew Quigley, Stantec NZ Ltd
- YPC Auckland - Using Smartphones to Measure Cycleway Roughness by Ayesha Carneiro, Beca Ltd
- YPC Auckland - Fabric and Samigrid Reinforcing Seal by Marat Khassenov, HEB Construction Ltd
- YPC Auckland - Engineering for Incident Response by Yan Zhou, Auckland Motorways
- YPC Rotorua - SH2 Pekatahi Bridge Deck Replacement Project by Sunny Zhang, NZTA
- YPC Rotorua - Smart Tools by Ola Shahin, WestLink Bay of Plenty
- YPC Rotorua - What is under the Huntly Section of the Waikato Expressway – Building four lanes over a reclaimed lake? by Natasha Jokhan, Opus International Consultants
- YPC Wellington - Construction in Canada by Victoria Walch, Fulton Hogan Ltd
- YPC Wellington - Measuring the Cost of Operation Resilience on State Highways? by Thanura Rabel, Opus International Consultants
- YPC Wellington - Use of Unmanned Aerial Vehicles (UAV) in disaster resilience by George Clemens, Fulton Hogan Ltd
- YPC Christchurch - The North Canterbury Earthquakes from a Bridging Perspective by Jonathan Creelman, Opus International Consultants Ltd
- YPC Christchurch - How to minimise the disruption to the roads from earthquake-impaired underground pipelines? by Dr. Melanie Liu, Beca Ltd
- YPC Christchurch - Emergency bridging for the North Canterbury Earthquakes by Daniel Helm, Downer NZ
- YPC Dunedin - Caversham Tunnel Civil Work Planning for Success by Alex Sutherland, Fulton Hogan Ltd
- YPC Dunedin - Peak Oil by Lydia Perkins, Fulton Hogan Ltd